Environmental Management Plan for Contract 3A.3: Section 4 - Right embankment of the Vistula from the Skawinka estuary to the Kościuszko barrage
Appendix 1 - Plan of mitigation measures
Appendix 2 - Plan of monitoring measures
Appendix 3 - List of national legal acts related to environmental protection
Appendix 4 - Administrative decisions
Appendix 5 - Map with location of the Works Contract
Appendix 6 - Map with location of the Works Contract in reference to protected areas and to NATURA 2000 sites
Appendix 7 - Map with location of the Works Contract in reference to areas of potential flood hazard
Appendix 8 - Maps with location of the Contract in refference to areas excluded from land of potential flood hazard
Appendix 9 - Map with location of the Works Contract’s elements
Download all files (ZIP)
Annex No. 1 to the Environmental Management Plan for Contract 3A.3: Section 4 - Right embankment of the Vistula from the Skawinka estuary to the Kościuszko barrage
Appendix 1 - Decision of RDEP, May 20, 2020