EMP for Contract 1B.1/1 (a): Reconstruction of the Odra River control infrastructure – adjusting to the III class of waterway, on the section from the village of Ścinawa to the estuary of the Nysa Łużycka River – Stage II

Appendix 4 - Copies of administrative decisions regarding the environmental protection is-sued for the Task:

Appendix 5 - Maps presenting the locations of Task:

Appendix 6 - Situation plans of groynes:

Appendix 8 -Reports on the public disclosure procedure:

Fundusze Europejskie
Rzeczpospolita Polska
Wody Polskie
Unia Europejska
CEB
World Bank