About project ORFPP
Audit
Documents
Environmental Management Plans
Multimedia
Project OVFMP
About project OVFMP
Audit
Documents
General dokuments
Draft Land Acqusiton Action Plan
Land Acqusiton Action Plan
Final reports of Land Acquisition and Resettlement Action Plan
Draft Environmental Management Plans
Environmental Management Plans
Final report of Environmental Management Plans
Multimedia
Investments
Middle and Lower Odra River
Kłodzko Valley
Upper Vistula
Forecasting Systems
Advertisements
Advertisements
Job offers
Contact
Search
Aa
Aa
Aa
Reset ustawień
Wersja czarno-biała
Wysoki kontrast
Documents
Home
Project OVFMP
Documents
Expertises and studies
Project Operations Manual
Environmental and Social Management
Resettlement Policy Framework
Procurement Plans
Land Acqusiton Action Plan
RAP for Contract 1A.1: Chlewice-Porzecze. Backwater embankment of Odra River at Myśla River and Modernization of Marwicki polder stage I and II
RAP for Contract 1A.2: Flood protection of Gryfino, Ognica, and Piasek upon the Odra River. Improvement of Marwice Polder, Stage III: modernization of Krajnik pump station.
RAP for Contract 1B.1/1 (b): Reconstruction of the road bridge in Krosno Odrzańskie with access roads
RAP for Contract 1B.2 Modernization works on boundary sections of Odra River, Stage I to provide Good Condition for Ice–breaking.
RAP for Contract 1B.3/1 Construction of mooring base for icebreakers
RAP for Contract 1B.3/2 Stage II – The construction of docking-mooring infrastructure on Lower Odra River and on boundary sections of Odra River as well as new aids to navigation
RAP for Contract 1B.5/1: Reconstruction of the bridge to ensure minimum clearance – railway bridge in km 733.7 of the Regalica River in Szczecin
RAP for Contract 1B.5/2: Reconstruction of a bridge to ensure minimum clearance – a road bridge at km 2.45 of Warta River in Kostrzyn nad Odrą
RAP for Contract 1B.6 – Flood protection of Nowa Sól and below Krosno Odrzańskie
RAP for Contract 1B.7: WFS Widawa – the rebuilding of the flood management system of the communes and municipalities Czernica, Długołeka, Wisznia Mała and Wrocław
RAP for the Contract 1B.8 – Flood Protection of Krosno Odrzańskie
RAP for the Contract 1C.1 – Extension and construction of flood embankments and Reconstruction of Czarny Kanał and Racza Struga
RAP for Contract 2A.1/1: Construction of “Boboszów” – a dry flood control reservoir on Nysa Kłodzka River
RAP for Contract 2A.1/2: Construction of a dry flood control reservoir on the Goworówka stream in Roztoki
RAP for Contract 2A.2/1: Construction of “Szalejów Górny” – a dry flood control reservoir on Bystrzyca Dusznicka River
RAP for Contract 2A.2/2: Construction of “Krosnowice” – a dry flood control reservoir on Duna stream
RAP for Contract 2B.1/1 Flood protection of the Nysa Kłodzka river valley
RAP for Contract 2B.2/1: Flood Management for Biała – Lądecka river and Morawa stream
RAP for Contract 2B.2/2 (a): Flood protection of cities along Bystrzyca Dusznicka river: Polanica-Zdrój, Szczytna river Kamienny Potok
RAP for Contract 3A.1: Construction of Vistula embankments in Cracow
RAP for Contract 3A.2 Flood Protection in Serafa Valley: Works Contract 3A.2/1 Flood protection in Serafa Valley – Malinówka 1 reservoir and Works Contract 3A.2/2 Flood protection in Serafa Valley – Malinówka 2 reservoir
RAP for Contract 3A.2/3 Flood Protection in Serafa Valley – Malinówka 3 Reservoir
RAP for Contract 3A.2/4 Flood Protection in Serafa Valley – Serafa 2 Reservoir
RAP for Contract 3A.3: Section 4 – The right embankment of the Vistula River from the estuary of Skawinka to the Kościuszko barrage
RAP for Contract 3A.4 Extension of a section of the right embankment downstream of the Dąbie Barrage, including development of a flood gate in the area of a repair yard
RAP for Contract 3A.5 Development of a flood gate at the left flood embankment in the area of water intakes for the Sendzimira Steel Mill in Cracow
RAP for Contract 3A.6 Construction of a pumping station for mobile pumps to drain the Lesisko complex
RAP for Contract 3B.1: Flood protection Sandomierz
ERRATUM FOR LARAP – LAND ACQUISITION AND RESETTLEMENT ACTION PLAN SUBCOMPONENT 3B: Flood protection of Sandomierz and Tarnobrzeg, Contract 3B.1 Flood protection Sandomierz, Contract 3B.1/1 Flood protection Sandomierz – completion of Task 3 and 4
RAP for Contract 3B.2: Flood Protection of Tarnobrzeg
RAP for Contract 3B.3: Flood Protection of Tarnobrzeg – stage 1 (Vistula River 1)
RAP for Contract 3D.1: San Progamme. Passive Protection in San basin. „San III – extension of the left embankment of the San River at km 0+000 – 4+445, Gorzyce Commune, Podkarpackie Province”
RAP for Contract 3D.2/1: Construction of the right embankment of the Biala River in the City of Tarnów
RAP for Contract 3D.2/2 – Expansion of the left and right embankment of the Biala River in the Tarnów Municipality and the City of Tarnów
RAP for Contract 3D.3 Łęg IV – extension of the left river embankment at chainage km 0+082 – 5+030 within the Commune of Gorzyce, and of the right embankment at chainage km 0+000 – 5+236 within the Commune of Gorzyce.
Final reports of Land Acquisition and Resettlement Action Plan
Final report on the implementation of the actions set out in the Land Acquisition and Resettlement Action Plan for Contract 1A.2: Flood protection of Gryfino, Ognica, and Piasek village on Odra River. Modernization of Marwicki Polder Stage III – pump station Krajnik
Final report on the implementation of the actions set out in the Land Acquisition and Resettlement Action Plan for Contract 1B.3/1 Construction of mooring base for icebreakers
Final report on the implementation of the actions set out in the Land Acquisition and Resettlement Action Plan for Contract 1B.3/2 Construction of berth mooring infrastructure on the Lower and Border Odra and new marking of the shipping Route
Final report on the implementation of the actions set out in the Land Acquisition and Resettlement Action Plan for Contract 1B.5/1 Reconstruction of bridge to ensure a minimum clearance – a railway bridge at km 733.7 of the river Regalica in Szczecin
Final report on the implementation of the actions set out in the Land Acquisition and Resettlement Action Plan for Contract 1C.1/1C.2: Flood protection of Słubice city – construction of flood embankments and reconstruction of Czarny Kanał and Racza Struga
Final report on the implementation of the actions set out in the Land Acquisition and Resettlement Action Plan for 3A.3: Section 4 – The right embankment of the Vistula River from the estuary of Skawinka to the Kościuszko barrage
Final report on the implementation of the activities indicated in the Land Acquisition and Resettlement Action Plan for Contract 3A.5: Development of a flood gate at the left flood embankment in the area of water intakes for the Sendzimira Steel Mill in Cracow
Final report on the implementation of the actions set out in the Land Acquisition and Resettlement Action Plan for Contract 3A.6 Construction of a pumping station for mobile pumps to drain the Lesisko complex
Final report on the implementation of the actions set out in the Land Acquisition and Resettlement Action Plan for Contract 3B.1 (3B.1/1): Flood protection of Sandomierz
Final report on the implementation of the actions set out in the Land Acquisition and Resettlement Action Plan for Contract 3B.2: Flood Protection of Tarnobrzeg
Final report on the implementation of the actions set out in the Land Acquisition and Resettlement Action Plan for Contract 3B.3: Flood Protection of Tarnobrzeg – Stage 1 (Vistula River 1)
Final report on implementation of measures determined in the LA&RAP WORKS CONTRACT 3D.1 San Programme. Passive Protection in San Basin.
Final report on the implementation of the actions set out in the Land Acquisition and Resettlement Action Plan for contract 3D.3 Łęg IV – extension of the left river embankment at chainage km 0+082 – 5+030 within the Commune of Gorzyce, and of the right embankment at chainage km 0+000 – 5+236 within the Commune of Gorzyce.
Environmental Management Plans
EMP for Contract 1A.1: Chlewice-Porzecze. Backwater embankment of Odra River at Myśla River and Modernization of Marwicki polder stage I and II
EMP for Contract 1A.2.: Flood protection of Gryfino, Ognica, and Piasek village on Odra River. Modernization of Marwicki Polder Stage III – pump station Krajnik
EMP for Contract 1B.1/1 (a): Reconstruction of the Odra River control infrastructure – adjusting to the III class of waterway, on the section from the village of Ścinawa to the estuary of the Nysa Łużycka River – Stage II
EMP for Contract 1B.1/1 (b): Rebuilding of the road bridge in Krosno Odrzańskie jointly with access roads
EMP for Contract 1B.2/1: Modernisation works on boundary sections of Odra River, Stage I to provide good Condition for Ice-breaking – Part 1
EMP for Contract 1B.2/2: Modernisation works on boundary sections of Odra River, Stage I to provide good Condition for Ice-breaking – Part 2
EMP for Contract 1B.2/3: Modernisation works on boundary sections of Odra River, Stage I to provide good Condition for Ice-breaking – Part 3
EMP for Contract 1B.3/1 Stage 1: Mooring base for icebreakers
EMP for Contract 1B.3/2 Stage II – The construction of docking-mooring infrastructure on Lower Odra River and on boundary sections of Odra River as well as new aids to navigation
EMP for Contract 1B.4/2: Dredging of Klucz-Ustowo ditch
EMP for Contract 1B.5/1: Reconstruction of the bridge to ensure minimum clearance – railway bridge in km 733.7 of the Regalica River in Szczecin
EMP for the Contract 1B.5/2 Reconstruction of the bridge to ensure minimum clearance – road bridge in km 2.45 of the Warta River in Kostrzyn nad Odrą
EMP for the Contract 1B.5/3: Reconstruction of bridge to ensure a minimum clearance (Railway bridge at km 615.1 of the Odra River in Kostrzyn nad Odrą)
EMP for Contract 1B.6: Flood protection of Nowa Sól and Below Krosno Odrzańskie – Task 1B.6/1: Nowa Sól
EMP for Contract 1B.6: Flood protection of Nowa Sól and Below Krosno Odrzańskie – Task 1B.6/2: Wężyska – Chlebowo
EMP for Contract 1B.7: WFS Widawa – the rebuilding of the flood management system of the communes and municipalities Czernica, Długołeka, Wisznia Mała and Wrocław
EMP for Contract 1B.8 – Flood protection of Krosno Odrzańskie
EMP for Contract 1B.9: Modernization of the flood embankment along the Ślęzoujście Street with road infrastructure
EMP for Contract 1C.1: Extension and construction of flood embankments and Reconstruction of Czarny Kanal and Racza Struga (Słubice)
EMP for Contract 2A.1/1: Construction of a dry flood control reservoir on Nysa Kłodzka River in Boboszow
EMP for Contract 2A.1/2: Construction of “Roztoki Bystrzyckie” – a dry flood control reservoir on Goworówka stream
EMP for Contract 2A.2/1: Construction of “Szalejów Górny” – a dry flood control reservoir on Bystrzyca Dusznicka River
EMP for Contract 2A.2/2: Construction of “Krosnowice” – a dry flood control reservoir on Duna stream
EMP for Contract 2B.1/1: Flood Protection of the Nysa Kłodzka Valley Międzylesie, Długopole-Zdrój, Bystrzyca Kłodzka, Kłodzko Facilities
EMP for Contract 2B.2/1: Flood protection of the Biała Lądecka River valley and Morawa River Facilities: Stronie Śląskie and Lądek Zdrój
EMP for Contract 2B.2/2: Flood protection of Bystrzyca Dusznicka River Valley and Kamienny Potok Facilities: Szczytna, Polanica-Zdrój and Duszniki-Zdrój
EMP for Contract 3A.1: Modernization of Vistula embankments in Cracow
EMP for Contract 3A.2: Flood protection in Serafa Valley – Works Contract 3A.2/1 Flood protection in Serafa Valley – Malinówka 1 reservoir, Works Contract 3A.2/2 Flood protection in Serafa Valley – Malinówka 2 reservoir
EMP for Contract 3A.2/3: Flood protection in Serafa Valley – Malinówka 3 reservoir
EMP for Contract 3A.2/4: Flood protection in Serafa Valley – Serafa 2 reservoir
EMP for Contract 3A.3: Section 4 – Right embankment of the Vistula from the Skawinka estuary to the Kościuszko barrage
EMP for Contract 3A.4: Extension of a section of the right embankment downstream of the Dąbie Barrage, including development of a flood gate in the area of a repair yard
EMP for Contract 3A.5: Development of a flood gate at the left flood embankment in the area of water intakes for the Sendzimira Steel Mill in Cracow
EMP for Contract 3A.6: Construction of a pumping station for mobile pumps to drain the Lesisko complex
EMP for Contract 3B.1: Flood protection Sandomierz
EMP for Contract 3B.2: Flood protection Tarnobrzeg
EMP for Contract 3B.3: Flood protection Tarnobrzeg – stage 1 (Vistula River 1)
EMP for Contract 3D.1: San Programme. Passive Protection in San Basin
EMP for Contract 3D.2/1: Construction of the right embankment of the Biala River in the City of Tarnów
EMP for Contract 3D.2/2: Expansion of the left and right embankment of the Biala River in the Tarnow Municipality and the City of Tarnów
EMP for Contract 3D.3: Łęg IV – extension of the left river embankment at chainage km 0+082-5+030 within the Commune of Gorzyce, and of the right embankment at chainage km 0+000-5+236 within the Commune of Gorzyce
EMP for Contract 4A.3.1: POLRAD Weather Radar Modernization
EMP for Contract 4A.3.2: Modernization of the PERUN lightning detection and location system
Final report of Environmental Management Plans
Final report of EMP for Contract 1A.1: Chlewice-Porzecze. Backwater embankment of Odra River at Myśla River and Modernization of Marwicki polder stage I and II
Final report of EMP for Contract 1A.2.: Flood protection of Gryfino, Ognica, and Piasek village on Odra River. Modernization of Marwicki Polder Stage III – pump station Krajnik
Final report of EMP for Contract 1B.3/1 Stage 1: Mooring base for icebreakers
Final report of EMP for Contract 1B.3/2 Stage II – The construction of docking-mooring infrastructure on Lower Odra River and on boundary sections of Odra River as well as new aids to navigationFinal report of EMP for Contract
Final report of EMP for Contract 1B.4/2: Dredging of Klucz-Ustowo ditch
Final report of EMP for Contract 1B.5/3: Reconstruction of bridge to ensure a minimum clearance (Railway bridge at km 615.1 of the Odra River in Kostrzyn nad Odrą)
Final report of EMP for Contract 1B.9: Modernization of the flood embankment along the Ślęzoujście Street with road infrastructure
Final report of EMP for Contract 2A.1/2: Construction of “Roztoki Bystrzyckie” – a dry flood control reservoir on Goworówka stream
Final report of EMP for 3A.3: Section 4 -Right embankment of the Vistula from the Skawinka estuary to the Kościuszko barrage
Final report of EMP for Contract 3A.6: Construction of a pumping station for mobile pumps to drain the Lesisko complex
Final report of EMP for Contract 3B.1: Flood protection Sandomierz
Final report of EMP for Contract 3B.1/1: Flood protection Sandomierz – completion of Tasks 3 and 4
Final report of EMP for Contract 3B.3: Flood protection Tarnobrzeg – stage 1 (Vistula River 1)
Final report of EMP for Contract 3B.2: Flood protection of Tarnobrzeg
Final report of EMP for Contract 3D.1: San Programme. Passive Protection in San Basin
Final report of EMP for Contract 3D.2/1: Construction of the right embankment of the Biala River in the City of Tarnów
Final report of EMP for Contract 3D.3: Łęg IV – extension of the left river embankment at chainage km 0+082-5+030 within the Commune of Gorzyce, and of the right embankment at chainage km 0+000-5+236 within the Commune of Gorzyce
Zainstaluj aplikację na swoim telefonie, kliknij w ikonę
Następnie wybierz pozycję "Dodaj do ekranu początkowego".
Zainstaluj BKP OPDOW jako aplikację
Zainstaluj