Environmental Management Plan for Contract 3D.2/2: Expansion of the left and right embankment of the Biala River in the Tarnow Municipality and the City of Tarnow
Appendix 1 - Plan of mitigation measures
Appendix 2 - Plan of monitoring measures
Appendix 3 - List of national legal acts connected with the environment protection
Appendix 4 - Decisions:
Appendix 4a - Decision on environmental conditions dated March 8, 2016
Appendix 4b - Opinion of the Provincial Heritage Conservator in Cracow 2
Appendix 4c - Note of the RDEP on protective strips
Appendix 4d - Note of the RDEP on replacement planting
Appendix 4e - Note of the RDEP on redevelopment and protection of streams
Appendix 5 - Map with location of the Contract
Appendix 6 - Location of the Contract in reference to protected areas and to NATURA 2000 sites
Appendix 7 - Map with location of the Contract in reference to potential flood risk areas
Appendix 8 - Map with location of the Contract in reference to areas excluded from potential flood risk
Appendix 9 - Map with location of natural habitats and fauna in the Contract area
Appendix 10 - Map with location of elements of the Contract
Download all files (ZIP)