Final report of EMP for Contract 3D.2/1: Construction of the right embankment of the Biala River in the City of Tarnów
Check List for implementation of measures listed in Appendix 1 and Appendix 2 to the EMP for the Contract 3D.2/1. Reporting Period: 1.11.2020 – 31.03.2022