EMP for Contract 3A.6 Construction of a pumping station for mobile pumps to drain the Lesisko complex
Appendix 1. Plan of Mitigation Measures
Appendix 2. Plan of Monitoring Measures
Appendix 3. List of National Legal Acts Related to Environmental Protection
Appendix 4a. Decision of RDEP in Cracow - July 27, 2020
Appendix 4b. Decision of RDEP in Cracow - August 6, 2020
Appendix 4c. Decision of RDEP in Cracow - January 27, 2021
Appendix 5. Map with location of the Contract
Appendix 6. Map with location of the Contract in reference to protected areas
Appendix 7. Map with location of the Contract in reference to areas of potential flood hazard
Appendix 8. Map with location of the Contract in reference to areas excluded from land of potential flood hazard
Appendix 9. Map with location of the Contract in reference to natural habitats and protected species occurrence sites, sheet 1
Appendix 9. Map with location of the Contract in reference to natural habitats and protected species occurrence sites, sheet 2
Appendix 10. Location map of the Contract elements, sheet 1
Appendix 10. Location map of the Contract elements, sheet 2
Download all files (ZIP)