EMP for Contract 3B.1: Flood protection Sandomierz
Appendix 4 - Copies of the final administrative decisions
Appendix 6 - Location map of the Task on the background of designated areas
Appendix 7 - Potential flood danger area sheet 1
Appendix 8 - Terrains excluded from the areas with a potential flood risk